PSS9 CYCLE SETTINGS FOR FACTORY ACCEPTANCE TESTING (FAT)
Posted by Joey Leffel on May 8th 2023
The PRIMUS Pri-Matic® control system’s first three cycle recipes (i.e., the cycle parameter data) are programmed during the PRIMUS Factory Acceptance Test (FAT). There are numerous parameters which ca